﻿{"id":405033,"date":"2019-12-05T11:00:03","date_gmt":"2019-12-05T18:00:03","guid":{"rendered":"https:\/\/www.swimmingworldmagazine.com\/news\/?p=405033"},"modified":"2019-12-04T16:31:13","modified_gmt":"2019-12-04T23:31:13","slug":"natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy","status":"publish","type":"post","link":"https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/","title":{"rendered":"Natare Provides New Headwall for Brantford, Ontario Aquatic Centre for FINA Compliancy"},"content":{"rendered":"<p><strong>INDIANAPOLIS, IN <\/strong>\u2013 Natare Corporation, along with their Canadian partner, Austin Carroll Pool Construction Ltd., recently provided a stainless steel headwall to assist the multi-faceted Wayne Gretzky Sports Centre with FINA compliancy.<\/p>\n<p><a href=\"http:\/\/www.fina.org\" target=\"_blank\" rel=\"noopener noreferrer\">FINA<\/a> (F\u00e9d\u00e9ration Internationale de Natation \/ International Swimming Federation) is the governing organization of all aquatics. It sets the rules and regulations for aquatic facilities to meet in order to hold international competitive swim meets.<\/p>\n<p>The 45 year old, 8-lane, 65 metre pool did not have an end wall configuration that met the FINA requirement for a 0.3m. rise about water level, which did not allow the use of swim timing touchpads. The solution was a stainless steel headwall to modify the existing end wall to comply with the FINA requirements.<\/p>\n<p>The headwall is 68\u2019 long, 3\u2019-3\/8\u201d wide, and 11-13\/16\u201d tall. It is constructed from 316L stainless steel and GPM polymer grating. It consists of a handhold, target markings, transition markers, and two (2) facility logos. The headwall can be removed if needed to allow for ample room of other aquatic programming to take place.<\/p>\n<div id=\"attachment_405032\" style=\"width: 910px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-405032\" data-attachment-id=\"405032\" data-permalink=\"https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/installation-of-wayne-gretzky-sports-centre-headwall_natare-corporation\/\" data-orig-file=\"https:\/\/vmrw8k5h.tinifycdn.com\/news\/wp-content\/uploads\/2019\/12\/Installation-of-Wayne-Gretzky-Sports-Centre-Headwall_Natare-Corporation.jpg\" data-orig-size=\"900,521\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"Installation of Wayne Gretzky Sports Centre Headwall_Natare Corporation\" data-image-description=\"&lt;p&gt;Installation of Wayne Gretzky Sports Centre Headwall_Natare Corporation&lt;\/p&gt;\n\" data-image-caption=\"&lt;p&gt;Installation of the new stainless steel headwall at the Wayne Gretzky Sports Centre Photo Courtesy: Austin Carroll Pool Construction Ltd&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/vmrw8k5h.tinifycdn.com\/news\/wp-content\/uploads\/2019\/12\/Installation-of-Wayne-Gretzky-Sports-Centre-Headwall_Natare-Corporation-700x500.jpg\" data-large-file=\"https:\/\/vmrw8k5h.tinifycdn.com\/news\/wp-content\/uploads\/2019\/12\/Installation-of-Wayne-Gretzky-Sports-Centre-Headwall_Natare-Corporation.jpg\" class=\"wp-image-405032 size-full\" src=\"https:\/\/vmrw8k5h.tinifycdn.com\/news\/wp-content\/uploads\/2019\/12\/Installation-of-Wayne-Gretzky-Sports-Centre-Headwall_Natare-Corporation.jpg\" alt=\"Installation of Wayne Gretzky Sports Centre Headwall_Natare Corporation\" width=\"900\" height=\"521\" srcset=\"https:\/\/vmrw8k5h.tinifycdn.com\/news\/wp-content\/uploads\/2019\/12\/Installation-of-Wayne-Gretzky-Sports-Centre-Headwall_Natare-Corporation.jpg 900w, https:\/\/vmrw8k5h.tinifycdn.com\/news\/wp-content\/uploads\/2019\/12\/Installation-of-Wayne-Gretzky-Sports-Centre-Headwall_Natare-Corporation-280x162.jpg 280w, https:\/\/vmrw8k5h.tinifycdn.com\/news\/wp-content\/uploads\/2019\/12\/Installation-of-Wayne-Gretzky-Sports-Centre-Headwall_Natare-Corporation-300x174.jpg 300w, https:\/\/vmrw8k5h.tinifycdn.com\/news\/wp-content\/uploads\/2019\/12\/Installation-of-Wayne-Gretzky-Sports-Centre-Headwall_Natare-Corporation-450x261.jpg 450w, https:\/\/vmrw8k5h.tinifycdn.com\/news\/wp-content\/uploads\/2019\/12\/Installation-of-Wayne-Gretzky-Sports-Centre-Headwall_Natare-Corporation-150x87.jpg 150w, https:\/\/vmrw8k5h.tinifycdn.com\/news\/wp-content\/uploads\/2019\/12\/Installation-of-Wayne-Gretzky-Sports-Centre-Headwall_Natare-Corporation-500x289.jpg 500w, https:\/\/vmrw8k5h.tinifycdn.com\/news\/wp-content\/uploads\/2019\/12\/Installation-of-Wayne-Gretzky-Sports-Centre-Headwall_Natare-Corporation-533x309.jpg 533w\" sizes=\"auto, (max-width: 900px) 100vw, 900px\" \/><p id=\"caption-attachment-405032\" class=\"wp-caption-text\">Installation of the new stainless steel headwall at the Wayne Gretzky Sports Centre Photo Courtesy: Austin Carroll Pool Construction Ltd<\/p><\/div>\n<p>Natare built the headwall in multiple sections at their Indianapolis, Indiana facility and then shipped it to the Brantford, Ontario aquatic centre. It was then assembled on-site and anchored to the existing pool end wall by technicians from Austin Carroll. Installation time was only eight (8) hours.<\/p>\n<p>The facility\u2019s manager of program and services, <strong>Karen Winter<\/strong>, was extremely happy with not only the process, but the finished product as well. \u201cFrom start to finish the installation of the new headwall and starting blocks at the Wayne Gretzky Sports Centre was great. Austin Carroll Pools was easy to work with, quick on communication, and completed the project efficiently and accurately.\u201d<\/p>\n<p>The investment that was made in the new headwall will benefit <a href=\"https:\/\/www.waynegretzkysportscentre.ca\/en\/index.aspx\" target=\"_blank\" rel=\"noopener noreferrer\">Wayne Gretzky Sports Centre<\/a> for years to come. The centre currently holds local and provincial swim meets, but are now eligible to be certified for FINA sanctioned events, including international competition. Any records that are set during competition will also be honored.<\/p>\n<p>Winter went on to say, \u201cThis new headwall and starting blocks will allow the Brantford Aquatic swim team to continue to compete at the top level!\u201d<\/p>\n<p>&nbsp;<\/p>\n<p><strong>About <a href=\"https:\/\/acpool.ca\" target=\"_blank\" rel=\"noopener noreferrer\">Austin Carroll Pool Construction Ltd<\/a>. <\/strong><\/p>\n<p>Austin Carroll is a commercial and public pool design and construction specialist located in Milton, Ontario. Since 2003, they have become synonymous with innovation, quality and attention to detail in pool construction and renovation. See more at www.acpool.ca.<\/p>\n<p><strong>About Natare Corporation <\/strong><\/p>\n<p>Natare is a world-renowned manufacturer of pool equipment and construction systems based in the United States (Indianapolis, Indiana). We have been recognized for our robust, high-value stainless steel pools, filtration system and pool accessories such as moving bulkheads. See more at <a href=\"https:\/\/www.natare.com\" target=\"_blank\" rel=\"noopener noreferrer\">www.natare.com<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>INDIANAPOLIS, IN \u2013 Natare Corporation, along with their Canadian partner, Austin Carroll Pool Construction Ltd., recently provided a stainless steel headwall to assist the multi-faceted Wayne Gretzky Sports Centre with<\/p>\n","protected":false},"author":7817,"featured_media":405031,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"dois","enabled":false},"version":2}},"categories":[15],"tags":[119674,881,119676,70618,184,119675,119673,142],"class_list":["post-405033","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry","tag-austin-carroll-pool-construction-ltd","tag-canada","tag-canadian-sports","tag-federation-internationale-de-natation","tag-fina","tag-karen-winter","tag-natare-corporation","tag-swimming"],"jetpack_publicize_connections":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.3 (Yoast SEO v24.3) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\r\n<title>Natare Provides New Headwall for Brantford, Ontario Aquatic Centre for FINA Compliancy - Swimming World<\/title>\r\n<meta name=\"description\" content=\"Natare and Austin Carroll Pool Construction Ltd., provide new a stainless steel headwall to the Wayne Gretzky Sports Centre in order to be FINA compliant\" \/>\r\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\r\n<link rel=\"canonical\" href=\"https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/\" \/>\r\n<meta property=\"og:locale\" content=\"en_US\" \/>\r\n<meta property=\"og:type\" content=\"article\" \/>\r\n<meta property=\"og:title\" content=\"Natare Provides New Headwall for Brantford, Ontario Aquatic Centre for FINA Compliancy\" \/>\r\n<meta property=\"og:description\" content=\"Natare and Austin Carroll Pool Construction Ltd., provide new a stainless steel headwall to the Wayne Gretzky Sports Centre in order to be FINA compliant\" \/>\r\n<meta property=\"og:url\" content=\"https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/\" \/>\r\n<meta property=\"og:site_name\" content=\"Swimming World\" \/>\r\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SwimmingWorld\" \/>\r\n<meta property=\"article:published_time\" content=\"2019-12-05T18:00:03+00:00\" \/>\r\n<meta property=\"article:modified_time\" content=\"2019-12-04T23:31:13+00:00\" \/>\r\n<meta property=\"og:image\" content=\"https:\/\/vmrw8k5h.tinifycdn.com\/news\/wp-content\/uploads\/2019\/12\/Wayne-Gretzky-Sports-Centre-Headwall-Installed_Natare-Corporation.jpg\" \/>\r\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\r\n\t<meta property=\"og:image:height\" content=\"720\" \/>\r\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\r\n<meta name=\"author\" content=\"Ashleigh Shay\" \/>\r\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\r\n<meta name=\"twitter:creator\" content=\"@swimmingworld\" \/>\r\n<meta name=\"twitter:site\" content=\"@swimmingworld\" \/>\r\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ashleigh Shay\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\r\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/\"},\"author\":{\"name\":\"Ashleigh Shay\",\"@id\":\"https:\/\/www.swimmingworldmagazine.com\/news\/#\/schema\/person\/7583efd85f18cd23c63386dc73bd740d\"},\"headline\":\"Natare Provides New Headwall for Brantford, Ontario Aquatic Centre for FINA Compliancy\",\"datePublished\":\"2019-12-05T18:00:03+00:00\",\"dateModified\":\"2019-12-04T23:31:13+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/\"},\"wordCount\":493,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.swimmingworldmagazine.com\/news\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/vmrw8k5h.tinifycdn.com\/news\/wp-content\/uploads\/2019\/12\/Wayne-Gretzky-Sports-Centre-Headwall-Installed_Natare-Corporation.jpg\",\"keywords\":[\"Austin Carroll Pool Construction Ltd.\",\"Canada\",\"Canadian Sports\",\"F\u00e9d\u00e9ration internationale de natation\",\"FINA\",\"Karen Winter\",\"Natare Corporation\",\"swimming\"],\"articleSection\":[\"Industry\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/\",\"url\":\"https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/\",\"name\":\"Natare Provides New Headwall for Brantford, Ontario Aquatic Centre for FINA Compliancy - Swimming World\",\"isPartOf\":{\"@id\":\"https:\/\/www.swimmingworldmagazine.com\/news\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/vmrw8k5h.tinifycdn.com\/news\/wp-content\/uploads\/2019\/12\/Wayne-Gretzky-Sports-Centre-Headwall-Installed_Natare-Corporation.jpg\",\"datePublished\":\"2019-12-05T18:00:03+00:00\",\"dateModified\":\"2019-12-04T23:31:13+00:00\",\"description\":\"Natare and Austin Carroll Pool Construction Ltd., provide new a stainless steel headwall to the Wayne Gretzky Sports Centre in order to be FINA compliant\",\"breadcrumb\":{\"@id\":\"https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/#primaryimage\",\"url\":\"https:\/\/vmrw8k5h.tinifycdn.com\/news\/wp-content\/uploads\/2019\/12\/Wayne-Gretzky-Sports-Centre-Headwall-Installed_Natare-Corporation.jpg\",\"contentUrl\":\"https:\/\/vmrw8k5h.tinifycdn.com\/news\/wp-content\/uploads\/2019\/12\/Wayne-Gretzky-Sports-Centre-Headwall-Installed_Natare-Corporation.jpg\",\"width\":1000,\"height\":720,\"caption\":\"Finished stainless steel headwall at the Wayne Gretzky Sports Centre Photo Courtesy: Austin Carroll Pool Construction Ltd\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.swimmingworldmagazine.com\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Natare Provides New Headwall for Brantford, Ontario Aquatic Centre for FINA Compliancy\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.swimmingworldmagazine.com\/news\/#website\",\"url\":\"https:\/\/www.swimmingworldmagazine.com\/news\/\",\"name\":\"Swimming World\",\"description\":\"The Global Leader in Aquatic News\",\"publisher\":{\"@id\":\"https:\/\/www.swimmingworldmagazine.com\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.swimmingworldmagazine.com\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.swimmingworldmagazine.com\/news\/#organization\",\"name\":\"Swimming World\",\"url\":\"https:\/\/www.swimmingworldmagazine.com\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.swimmingworldmagazine.com\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/vmrw8k5h.tinifycdn.com\/news\/wp-content\/uploads\/2022\/01\/SWorld_BLKBKG-1.jpg\",\"contentUrl\":\"https:\/\/vmrw8k5h.tinifycdn.com\/news\/wp-content\/uploads\/2022\/01\/SWorld_BLKBKG-1.jpg\",\"width\":1799,\"height\":900,\"caption\":\"Swimming World\"},\"image\":{\"@id\":\"https:\/\/www.swimmingworldmagazine.com\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/SwimmingWorld\",\"https:\/\/x.com\/swimmingworld\",\"https:\/\/instagram.com\/swimmingworldmag\/\",\"https:\/\/www.youtube.com\/user\/SwimmingWorldSPI\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.swimmingworldmagazine.com\/news\/#\/schema\/person\/7583efd85f18cd23c63386dc73bd740d\",\"name\":\"Ashleigh Shay\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.swimmingworldmagazine.com\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/a31eed023b73833f0902c37fbc5f574c?s=96&d=blank&r=pg\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/a31eed023b73833f0902c37fbc5f574c?s=96&d=blank&r=pg\",\"caption\":\"Ashleigh Shay\"},\"url\":\"https:\/\/www.swimmingworldmagazine.com\/news\/author\/ashleigh-shay\/\"}]}<\/script>\r\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Natare Provides New Headwall for Brantford, Ontario Aquatic Centre for FINA Compliancy - Swimming World","description":"Natare and Austin Carroll Pool Construction Ltd., provide new a stainless steel headwall to the Wayne Gretzky Sports Centre in order to be FINA compliant","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/","og_locale":"en_US","og_type":"article","og_title":"Natare Provides New Headwall for Brantford, Ontario Aquatic Centre for FINA Compliancy","og_description":"Natare and Austin Carroll Pool Construction Ltd., provide new a stainless steel headwall to the Wayne Gretzky Sports Centre in order to be FINA compliant","og_url":"https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/","og_site_name":"Swimming World","article_publisher":"https:\/\/www.facebook.com\/SwimmingWorld","article_published_time":"2019-12-05T18:00:03+00:00","article_modified_time":"2019-12-04T23:31:13+00:00","og_image":[{"width":1000,"height":720,"url":"https:\/\/vmrw8k5h.tinifycdn.com\/news\/wp-content\/uploads\/2019\/12\/Wayne-Gretzky-Sports-Centre-Headwall-Installed_Natare-Corporation.jpg","type":"image\/jpeg"}],"author":"Ashleigh Shay","twitter_card":"summary_large_image","twitter_creator":"@swimmingworld","twitter_site":"@swimmingworld","twitter_misc":{"Written by":"Ashleigh Shay","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/#article","isPartOf":{"@id":"https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/"},"author":{"name":"Ashleigh Shay","@id":"https:\/\/www.swimmingworldmagazine.com\/news\/#\/schema\/person\/7583efd85f18cd23c63386dc73bd740d"},"headline":"Natare Provides New Headwall for Brantford, Ontario Aquatic Centre for FINA Compliancy","datePublished":"2019-12-05T18:00:03+00:00","dateModified":"2019-12-04T23:31:13+00:00","mainEntityOfPage":{"@id":"https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/"},"wordCount":493,"commentCount":0,"publisher":{"@id":"https:\/\/www.swimmingworldmagazine.com\/news\/#organization"},"image":{"@id":"https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/#primaryimage"},"thumbnailUrl":"https:\/\/vmrw8k5h.tinifycdn.com\/news\/wp-content\/uploads\/2019\/12\/Wayne-Gretzky-Sports-Centre-Headwall-Installed_Natare-Corporation.jpg","keywords":["Austin Carroll Pool Construction Ltd.","Canada","Canadian Sports","F\u00e9d\u00e9ration internationale de natation","FINA","Karen Winter","Natare Corporation","swimming"],"articleSection":["Industry"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/","url":"https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/","name":"Natare Provides New Headwall for Brantford, Ontario Aquatic Centre for FINA Compliancy - Swimming World","isPartOf":{"@id":"https:\/\/www.swimmingworldmagazine.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/#primaryimage"},"image":{"@id":"https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/#primaryimage"},"thumbnailUrl":"https:\/\/vmrw8k5h.tinifycdn.com\/news\/wp-content\/uploads\/2019\/12\/Wayne-Gretzky-Sports-Centre-Headwall-Installed_Natare-Corporation.jpg","datePublished":"2019-12-05T18:00:03+00:00","dateModified":"2019-12-04T23:31:13+00:00","description":"Natare and Austin Carroll Pool Construction Ltd., provide new a stainless steel headwall to the Wayne Gretzky Sports Centre in order to be FINA compliant","breadcrumb":{"@id":"https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/#primaryimage","url":"https:\/\/vmrw8k5h.tinifycdn.com\/news\/wp-content\/uploads\/2019\/12\/Wayne-Gretzky-Sports-Centre-Headwall-Installed_Natare-Corporation.jpg","contentUrl":"https:\/\/vmrw8k5h.tinifycdn.com\/news\/wp-content\/uploads\/2019\/12\/Wayne-Gretzky-Sports-Centre-Headwall-Installed_Natare-Corporation.jpg","width":1000,"height":720,"caption":"Finished stainless steel headwall at the Wayne Gretzky Sports Centre Photo Courtesy: Austin Carroll Pool Construction Ltd"},{"@type":"BreadcrumbList","@id":"https:\/\/www.swimmingworldmagazine.com\/news\/natare-provides-new-headwall-for-brantford-ontario-aquatic-centre-for-fina-compliancy\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.swimmingworldmagazine.com\/news\/"},{"@type":"ListItem","position":2,"name":"Natare Provides New Headwall for Brantford, Ontario Aquatic Centre for FINA Compliancy"}]},{"@type":"WebSite","@id":"https:\/\/www.swimmingworldmagazine.com\/news\/#website","url":"https:\/\/www.swimmingworldmagazine.com\/news\/","name":"Swimming World","description":"The Global Leader in Aquatic News","publisher":{"@id":"https:\/\/www.swimmingworldmagazine.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.swimmingworldmagazine.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.swimmingworldmagazine.com\/news\/#organization","name":"Swimming World","url":"https:\/\/www.swimmingworldmagazine.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.swimmingworldmagazine.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/vmrw8k5h.tinifycdn.com\/news\/wp-content\/uploads\/2022\/01\/SWorld_BLKBKG-1.jpg","contentUrl":"https:\/\/vmrw8k5h.tinifycdn.com\/news\/wp-content\/uploads\/2022\/01\/SWorld_BLKBKG-1.jpg","width":1799,"height":900,"caption":"Swimming World"},"image":{"@id":"https:\/\/www.swimmingworldmagazine.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SwimmingWorld","https:\/\/x.com\/swimmingworld","https:\/\/instagram.com\/swimmingworldmag\/","https:\/\/www.youtube.com\/user\/SwimmingWorldSPI"]},{"@type":"Person","@id":"https:\/\/www.swimmingworldmagazine.com\/news\/#\/schema\/person\/7583efd85f18cd23c63386dc73bd740d","name":"Ashleigh Shay","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.swimmingworldmagazine.com\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/a31eed023b73833f0902c37fbc5f574c?s=96&d=blank&r=pg","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/a31eed023b73833f0902c37fbc5f574c?s=96&d=blank&r=pg","caption":"Ashleigh Shay"},"url":"https:\/\/www.swimmingworldmagazine.com\/news\/author\/ashleigh-shay\/"}]}},"cc_featured_image_caption":{"caption_text":"","source_text":"","source_url":""},"jetpack_featured_media_url":"https:\/\/vmrw8k5h.tinifycdn.com\/news\/wp-content\/uploads\/2019\/12\/Wayne-Gretzky-Sports-Centre-Headwall-Installed_Natare-Corporation.jpg","jetpack_shortlink":"https:\/\/wp.me\/p56Jja-1HmN","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.swimmingworldmagazine.com\/news\/wp-json\/wp\/v2\/posts\/405033","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.swimmingworldmagazine.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.swimmingworldmagazine.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.swimmingworldmagazine.com\/news\/wp-json\/wp\/v2\/users\/7817"}],"replies":[{"embeddable":true,"href":"https:\/\/www.swimmingworldmagazine.com\/news\/wp-json\/wp\/v2\/comments?post=405033"}],"version-history":[{"count":0,"href":"https:\/\/www.swimmingworldmagazine.com\/news\/wp-json\/wp\/v2\/posts\/405033\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.swimmingworldmagazine.com\/news\/wp-json\/wp\/v2\/media\/405031"}],"wp:attachment":[{"href":"https:\/\/www.swimmingworldmagazine.com\/news\/wp-json\/wp\/v2\/media?parent=405033"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.swimmingworldmagazine.com\/news\/wp-json\/wp\/v2\/categories?post=405033"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.swimmingworldmagazine.com\/news\/wp-json\/wp\/v2\/tags?post=405033"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}